A change is as good as a rest

20140711-165713.jpg
And I was glad of a rest from straining end braces (and my back) when the poly for the main and sub main lines turned up along with a ripper/pipe layer.
Spent Thursday afternoon laying out the lines, (well it was a beautiful day,) and, after a morning on the braces, Craig turned up with the tractor. I think nothing so far has gone as smoothly

20140711-170836.jpg
In 2 1/2 hours we had laid around 800m of 2″ and 1″ pipe.

20140711-171211.jpg.

Think that counts as a successful day.